| Name | Document |
|---|---|
| Details of contracts concluded during the month of NOVEMBER 2019 under Civil Engineering Department | Download |
| Details of contracts concluded during the month of OCTOBER 2019 under Civil Engineering Department | Download |
| Details of contracts concluded during the month of SEPTEMBER 2019 under Civil Engineering Department | Download |
| Contracts concluded during Jan. 2011 and Status of Ongoing Contracts work as on 31st Jan 2011 (works costing Rs.25 lakhs and above) | Download |
| Contracts concluded during December 2010 and Status of Ongoing Contract works as on 31st December,2010 (work costing Rs.25 lakhs and above) until Civil Engg.Department | Download |
| Augmentation of Fire Fighting Facility at North Tanker Berth |